ABOITIZ Power Corp. (AboitizPower) said on Thursday that the rated capacity of its Binga hydroelectric power plant in Benguet operated by its unit SN Aboitiz Power-Benguet Inc. has effectively increased to 140 megawatts from 125.8 MW previously.

In a disclosure to the Philippine Stock Exchange (PSE), Aboitiz Power said it was advised by SN Aboitiz Power-Benguet, Inc. that “it received a copy of the amended Certificate of Compliance (COC) dated April 6, 2015 from the Energy Regulatory Commission (ERC) for all four units of the Binga Hydroelectric Power Plant (Binga HEPP) located at Brgy. Tinongdan, Itogon, Benguet.”

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details