• Irrigation Project in northern Iloilo begins

    0

    ILOILO CITY: The National Irrigation Administration started the construction of a small reservoir irrigation project in the upper farming area of Barangay Nueva Invencion in the municipality of Barotac Viejo in northern Iloilo.

    Advertisements

    Department of Agriculture Secretary Proceso Alcala said the project is expected to irrigate some 2,050 hectares of farmlands that include new area of 265 hectares and restoration of 459 hectares including 1,326 hectares as area for rehabilitation.

    Senate President Franklin M. Drilon and fifth district Congressman Niel Tupas Jr led the cornerstone laying of the reservoir irrigation project designed to irrigate 2,050 hectares during the wet season and another 2,050 hectares in the dry season. The project will be completed by June 2016.

    The project consists of a dam with earth embankment of 27 meters, drainage area, spillway of ungated Ogee type, diversion and irrigation conduits and catchment and storage areas,

    Alcala said the project is the answer to the farmers cry for a sustainable irrigation facility as northern Iloilo is currently suffering from the severe drought. Farming lands are mostly affected as the El Niño phenomenon continues to lambast Panay island farms and food production areas.

    Alcala said the irrigation project will almost double rice production in the area from 265 to 409 metric tons and will generate several labor employment opportunities during the construction period specifically with unemployed farmers during the dry season.

    Share.
    loading...
    Loading...

    Please follow our commenting guidelines.

    Comments are closed.