THE Redondo Peninsula (RP) Energy Inc. is lowering by half the target capacity of its newest coal-fired power plant at the Subic Bay Freeport Zone in Zambales.

The consortium is set to change the project parameters to reduce the capacity from 600 megawatts (MW) to 300 MW, Meralco Chairman Manuel V. Pangilinan said.

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details