SAN Miguel Corporation (SMC) eyes to accelerate its dredging operations at the Tullahan-Tinajeros River System in the first two quarters of the year, before the rainy season sets in, to help reduce flooding at areas near the 27 kilometer-long tributary stretching from La Mesa Dam to the Manila Bay.

This, after SMC President and Chief Operating Officer Ramon Ang reported that the company was able to extract 83,600 metric tons of silt and solid waste from the river in 2020, despite limitations brought on by the Luzon-wide lockdown due to the Covid-19 pandemic. The dredging complemented the flood mitigation measures implemented by the cities of Navotas and Malabon.

Premium + Digital Edition

Ad-free access


P 80 per month
(billed annually at P 960)
  • Unlimited ad-free access to website articles
  • Limited offer: Subscribe today and get digital edition access for free (accessible with up to 3 devices)

TRY FREE FOR 14 DAYS
See details
See details